The focus of this one-day training seminar is the design and installation of commercial PV systems using Sunny Central and Sunny Tower. Threephase configurations, string sizing, DC and AC wiring, revenue grade metering, data logging and online reporting are covered in depth to respond to the demands of engineers, developers, integrators, utility officials and installers of tens of kilowatts to megawatt-level commercial plants.